2 visitors on line

klein1.jpg
prefab-little-2.jpg
middel1.jpg
groot1.jpg

Date & Time in Bali

CURRENT LOCAL DATE AND TIME IN BALI:

Monday, 10th December 2018
7:59:11 am

Previous page

 

The total choice of models, material options, payment system and/or combinations thereof are in "abundance". To select your best option tailored to fit your requirements and local circumstances we may encourage you to follow the steps as outlined below. It may take some time and effort, however, the result will be satisfying.  

Step 1: Chose a model from one of our detail model pages. So you wish, make a screen print of the drawings shown. If done, continue with the next step, or you may first jump to step 4 to save time. After the inquiry has been sent continue with step 4. 
Step 2: Scrutinize the design that you copied. If you are confident that this is what you are looking for continue with the next step.
Step 3: Determine the building option (basic, standard, premium or superior). Verify this via <prefab material options> (This may require some time and effort)
Step 4: Check the price via our <price list> you have to inquire for (the price list will be e-mailed within a period of max. 8 hours). If the price is right continue with the next step
Step 5: Chose a payment system that suits you best. Check <payment system>


Once you are satisfied and confident you may contact us via de form below and state the model code number of your choice, the material option and the required payment system. We wil e-mail you a confirmation of the costs and conditions agreed to. The fabrication will start as soon as we have received the D/P

In the event that you would like to have a unit build based on your own design we advise you to review this page <custom design>

 

Order form

 

 

 

 

 

Reviews from Bali Prefab World

"Bali Prefab World is doing an excellent job of modeling the 3-D frame structure in STAAD and now analyzing the individual members to ensure that they are not overstressed. I have just completed a review of the column analysis for the primary columns supporting the roof, and it is well presented and clearly shows the members are adequate size. This type of analysis would not have been possible by hand calculation because of the complexity of the roof structure. Job well done Bali Prefab World".
Review from: Professor Ian Robertson, University of Hawaii
Project: 400 m2 dwelling for Maui
Date: 12-06-2012.
Rating: 5 out of 5.

Read more testimonials from Bali Prefab World: click here
Dear Visitor, In order to show proof and evidence that these testimonials are genuine you may send us an e-mail with a request to provide the e-mail address of the publisher of the testimonial. We will forthwith send you the information so that you can contact the person.
Ask a question
Read our copyrights